The Ranch

Print
Press Enter to show all options, press Tab go to next option
The Ranch DEIR  Date
The Ranch DEIR - Full Document  August 16, 2019  
0.0 Cover  August 16, 2019  
0.0 Table of Contents August 16, 2019  
0.0 Executive Summary  August 16, 2019 
1.0 Introduction  August 16, 2019
2.0 Project Description  August 16, 2019 
3.1 Aesthetics and Visual Resources  August 16, 2019 
3.2 Air Quality  August 16, 2019 
3.3 Biological Resources  August 16, 2019 
3.4 Cultural and Tribal  August 16, 2019 
3.5 Geology and Soils  August 16, 2019 
3.6 Greenhouse Gases  August 16, 2019 
3.7 Hazards and Hazardous Materials August 16, 2019 
3.8 Hydrology and Water Quality  August 16, 2019 
3.9 Land Use  August 16, 2019 
3.10 Noise August 16, 2019 
3.11 Population and Housing August 16, 2019 
3.12 Public Services and Recreation   August 16, 2019  
3.13 Transportation  August 16, 2019 
3.14 Utilities  August 16, 2019 

4.0 Other CEQA-Required Topics

August 16, 2019 
5.0 Alternatives  August 16, 2019 
6.0 Report Preparers  August 16, 2019 
7.0 References   August 16, 2019 

 

 Appendices  Date
 Appendix A - Initial Study, NOP, and NOP Comments  August 16, 2019
 Appendix B - Air Quality GHG and Energy   August 16, 2019
 Appendix B.1 - CalEEMod Outputs   August 16, 2019
 Appendix B.2 - Energy Outputs   August 16, 2019
 Appendix B.3 - Determination of MTPSCS Consistency Worksheet   August 16, 2019
 Appendix B.4 - Analysis of Models and Tools to Correlate Project-Generated Pollutants to Health End Points  August 16, 2019 
 Appendix C - Biological Resources   August 16, 2019
 Appendix C.1 - Aquatic Resources Delineation Report   August 16, 2019
 Appendix C.2 - Biological Resources Assessment    August 16, 2019
 Appendix C.3 - Special Status Plant Survey    August 16, 2019
 Appendix D - Cultural Resources   August 16, 2019
 Appendix D.1 - Determination of Eligibility and Effect   August 16, 2019
 Appendix D.2 - The Ranch Updated Cultural Resources Inventory and Evaluation   August 16, 2019
 Appendix E - Preliminary Geotechnical Engineering Report   August 16, 2019
 Appendix F - Phase I Environmental Site Assessment   August 16, 2019
 Appendix G - The Ranch Project Consistency with Rancho Cordova General Plan Policies    August 16, 2019
 Appendix H - Environmental Noise Assessment   August 16, 2019
 Appendix I - Transportation Appendices     August 16, 2019
 Appendix I.1 - Traffic Impact Analysis    August 16, 2019
 Appendix I.2 - Memo RE Jaeger Ranch Traffic Impact Study, Draft Other Considerations   August 16, 2019
 Appendix I.3 - Memo RE Jaeger Ranch Supplemental Traffic Analyses, Draft Traffic Impact  Analysis Surfaces   August 16, 2019
 Appendix I.4 - Memo RE Jaeger Ranch Supplemental Traffic Analyses, Draft Trip Distribution   August 16, 2019
 Appendix J - Utilities Appendices     August 16, 2019
 Appendix J.1 - Drainage Study    August 16, 2019
 Appendix J.2 -  Level 1 Sewer Study   August 16, 2019
 Appendix J.3 - Level 2 Sewer Study    August 16, 2019
 Appendix J.4 - Water Supply Assessment   August 16, 2019